This is our process

From the moment you reach out to the moment you first power your system on, our process is made to be as pain free, simple, and efficient as possible for you!

Step 1 - Consultation 

We come out to your home to discuss your needs, wants, preconceptions and goals. At that point we will present you with a preliminary design and we will go over paperwork. It's hands off from here, the rest is left to us.

Step 3 - Permitting

All the necessary documents and permits will be filed with the appropriate authorities. After permitting is complete you will receive a call and an install date will be scheduled.

Step 5 - Inspection

The city/council/HOA will inspect and sign off that all work was done correctly and all aspects of your Solar System are within and up to code.

Step 7 - Permission to operate

Permission To Operate. The day you have been waiting for! The process is now over and you can enjoy green energy provided by the sun itself!

Step 2 - Engineering

Within the next week or two the engineers will review and make sure your panels and system are placed in the most ideal location for your home.

Step 4 - Install

The BIG DAY! Yes, 1 day. The typical install for residential homes is only one day!

Step 6 - Interconnection

Interconnection is where you receive permission to connect with the power grid. Don't worry, we take care of that for you too!